The product is the same everywhere. What changes is the specification language, the documentation the buyer has to file, the climate the media has to survive, and how the goods reach site. Those four things decide whether a quotation is usable.
We build the range against the markets below in this order. It is not a claim about where we already sell — it is where the specification work is aimed.
The most demanding documentation environment: declarations, traceability and drawings expected as standard, and a permit framework that names the treatment targets rather than leaving them to the designer.
EN naming · metric · declarations · FOB & CIF Priority 2Large reconstruction and replacement demand ahead. The engineering constraint that dominates is cold: low-temperature nitrification, freeze protection and plastics behaviour below zero.
GOST naming · cold climate · rail and sea Priority 2Heat, UV and dust do the damage here, and water is scarce enough that reuse is the design driver rather than a later upgrade. Cooling and desalination pre-treatment are the adjacent duties.
UV & heat · reuse · Gulf ports Priority 3Warm service, high humidity, cost sensitivity and — most of all — plants that have to run with the staff and the power available. Over-specification fails here as often as under-specification.
Tropical · right-sizing · container logisticsFour things we do not vary by region, because they are the ones that cause failures.
| What | Why it does not change by market |
|---|---|
| Sizing arithmetic | Surface loading rate, fill fraction and nozzle count are physical. A clarifier in Lagos and one in Hamburg follow the same equation; only the inputs differ. |
| Published dimensions | Pore sizes, module sizes, carrier types and diffuser diameters are what they are. Unit conversion is available on site rather than in a footnote. |
| What we will not claim | Where a value depends on the water chemistry, the temperature or the actual load, it is stated as On request rather than given a nominal figure that will not survive commissioning. |
| The enquiry questions | Flow, influent analysis, target effluent, quantity unit and destination port — asked in every market, because without them a price cannot be checked. |
The destination changes the packing, the documentation and the standard your buyer has to file against. Send both and the quotation is built for that market rather than adapted afterwards.
Request a quotationNo obligation - response within 24h (working days)