Home / Industries / Palm oil mill effluent (POME)
Application: palm oil

Media for palm oil mill effluent

POME is one of the strongest industrial effluents in regular commercial use, and the mills that treat it are usually hot, remote and short of land. That combination is what makes a compact biological stage with a large protected surface attractive.

Also searched as: pome treatment media · palm oil mill effluent mbbr · anaerobic pond polishing media · palm oil wastewater carrier media malaysia indonesia

The train, and where media belongs

De-oiling and coolingNo media. POME arrives hot and fatty; the de-oiling and buffer ponds do the work that keeps everything downstream alive
Anaerobic ponds or tankNo media in the classic pond system; tank digesters use mixing, not biofilm carriers
Aerobic or facultative polishingThis is where moving bed carriers earn their place: the remaining load is dilute, the pond is the land constraint, and the surface area per cubic metre decides the footprint
Final solidsLamella settling media where discharge to a river is monitored and the mill has no more land
A media supplier that proposes carriers for the anaerobic stage of a pond-based mill is selling into the wrong place. The anaerobic stage is a hydraulic retention volume problem, not a surface area problem.

Specifying carriers for a tropical mill

Our published carrier data holds in the tropics without modification: the working range is 5–60 °C, so ambient POME polishing sits comfortably inside it, and HDPE is unaffected by the effluent chemistry. The published figures a mill needs are the same ones any plant uses:

Specific surfaceOver 800 to over 1000 m²/m³ depending on grade
Void fraction85–90 %
Fill fraction15–67 % of reactor volume
Organic oxidation2000–15000 g/m³·d
Biofilm development3–15 days
Service lifePublished beyond 15 years

The practical constraint in most mills is not the biology, it is the aeration: a moving bed polishing stage needs diffusers, air pipe and a blower that the mill may not have. We specify the carriers, the disc aerators and the ABS air pipe together so the retrofit is one scope rather than three suppliers blaming each other.

Working in Malaysia and Indonesia

Projects in this sector are usually mill-owned retrofits rather than consultant-led tenders, which changes what the enquiry looks like: pond volumes as built (not as designed), the mill throughput in tonnes of FFB, the current discharge consent and the land available are more useful than a specification document. We quote against those and state clearly which stage the media is for.

Products: MBBR carriers · disc aerators · ABS air pipe · settling media · market notes: South-East Asia and Africa · industries: all applications.

Frequently asked

Can MBBR replace the anaerobic ponds?

No. The anaerobic stage is a retention volume and mixing duty; carriers do not change the digestion capacity of a pond. What carriers can do is take the load off the aerobic polishing stage and let a mill meet consent in a smaller footprint than additional ponds would need.

Does the tropical climate change the carrier specification?

Not the material - HDPE is unaffected and the published working range is 5-60 degrees C. It changes the biology: warmer effluent means faster kinetics, and it changes the aeration design, which is usually the real constraint in a mill retrofit.

What information does a mill need to send?

Mill throughput in tonnes of FFB, the pond volumes as built, the current discharge consent, the land available and the aeration equipment already installed. Those five answers produce a specification; a generic request for a price does not.

Do you supply the aeration as well as the media?

Yes - carriers, disc aerators and ABS air pipe are specified as one scope, because a moving bed stage that is short of air looks exactly like a stage that is short of media, and separating the two purchases makes that ambiguity permanent.

Send the mill throughput and the pond volumes

We specify the polishing stage as media plus aeration, and say plainly where carriers do not belong.